Create the existing-condition record
Measure the room and openings; photograph finishes, fixtures, visible damage and access routes without diagnosing hidden moisture.
Room scope ledger
Organize demolition, layout, plumbing, electrical, moisture assemblies, fixtures, finishes, protection and closeout.
Decision file
Measure the room and openings; photograph finishes, fixtures, visible damage and access routes without diagnosing hidden moisture.
List removals, salvage, protection, hazardous-material assessment dependencies and concealed-condition rules.
Identify each item to keep, replace in place, relocate, add or delete plus dimensions that need design confirmation.
Separate plumbing, ventilation, electrical, lighting, heating and structural interfaces with their required roles and inspections.
Record substrate, waterproofing system, transitions, penetrations, tile or finish basis, fixtures, accessories and owner-supplied items.
List testing or photos where applicable, inspections, manuals, care information, spare materials, deficiency process and warranty evidence.
Turn user routines into explicit needs for bathing, toileting, grooming, storage, cleaning, lighting, ventilation and assistance. Rank essential outcomes separately from finish preferences so value decisions do not erase functional requirements.
Mark every fixture, wall, door, window, floor area, fan, outlet and control as retained, relocated, removed or new. Link each move to demolition, rough-in, substrate, approval and finish consequences.
Before pricing, specify wet-area details, plumbing and electrical inspections, ventilation records, concealed-work photographs, product data, deficiency review and care information expected at handover. Assign who creates and approves each item.
Combine measured plan, user requirements, keep-move-replace schedule, demolition limits, plumbing and electrical changes, wet-area details, ventilation route, fixture and finish schedule, permits, strata or suite constraints and protection. Link every selected product and allowance to a model, quantity or decision deadline. Add inspection, concealed-work photograph, test, deficiency and care records expected at handover. Control revisions and owner approvals. The book should let each trade price and build the same room without claiming that a checklist alone certifies structure, accessibility, waterproofing, ventilation or code compliance. Walk the scope book room-by-room with the accepted proposer and owner before demolition. Resolve who supplies, approves, stores and installs every scheduled item, then issue the meeting decisions under a new controlled revision.